The ‘Monitor’ from the LIFE+ programme visited the location on September 8. She was given a presentation on the Dutch and German parts of the project and attended the drilling of a new FHVI well at the Bergakkerweg in Loenen. The Monitor also checked a number of administrative matters. Such Monitor visits take place at least once a year.
![](https://aerfit.eu/wp-content/uploads/Aerfit-bezoek-monitoringscommissie-720x380.png)